8 October 2021 - Video
An approach to quantifying risk savings made in the risk review process has helped demonstrate safer methods working on the High Speed Two (HS2) Enabling Works Contract South. By quantifying...
25 April 2022 - Video
On the 24th March 2020, CSjv initially paused in response to the introduction of “lockdown” measures as a result of the COVID-19 pandemic. CSjv recommenced where safe to do so,...
This is the first time that a Utilities contract has had a full temporary works design and inspection regime for our traditional fencing, which is usually Herras. The favoured method...
We have worked extremely hard to create a collaborative relationship with HS2, ensuring continued focus on the needs of both delivery partner and HS2, and creating a common approach and...
The EWC south programme of works was in a position where the majority of physical works were finished, but only a handful of projects were formally completed. In order to...
Previously, the permit system was aligned to traditional construction sites or rural areas. The team had to adapt certain aspects of the process, to ensure work could be undertaken safely...
4 December 2023 - Video
Design House JV is approaching the end of a challenging Phase 1 delivery period. A team of organisational psychologists created an employee recognition system called Kudos, to boost morale and...